• construction machinery telescopic hydraulic lift

    CJGeo Geotechnical Contractors CJGeo

    cellular concrete From low pressure annular space grouting to tunnel abandonments and lightweight fills, we place cellular concrete for geotechnical and utility applications throughout the East Coast. With batch and continuous generation capabilities, we have done placements as small as 1.5 cubic yards, to more than 1500 cubic yards.

  • double acting hydraulic cylinder

    Ballastless track - Wikipedia

    A ballastless track or slab track is a type of railway track infrastructure in which the traditional elastic combination of ties/sleepers and ballast is replaced by a rigid construction of concrete or asphalt.

  • solenoid ventil SYJ3120-5LZ pneumatic cylinders for sale

    Climate Protestors Block a Railway with Concrete

    Apr 19, 2019· “About 2am on Friday, a woman activist chained herself to a concrete-filled 44-gallon drum placed on the same railway line in Wynnum West.” Unless she is Russian or a serious weightlifting contender, she didn’t just carry that drum of concrete onto the tracks by herself.

  • 500 ton prestressing jack

    Rail - CJGeo Geotechnical Contractors CJGeo

    Other Rail Applications For Polyurethane Injection. High density polyurethane injection can also be used to raise precast rail structures other than modular grade crossings, such as inspection pits. Additional, CJGeo uses polyurethane for culvert joint repair, rebuilding failed corrugated metal pipes and void filling applications. Talk to a Pro.

  • easy operation cylinder

    How to Fix Railway Sleepers? - rail-fastener.com

    Kinds of Railway Sleepers and Their Fixing Methods ... and use a jack to lift and correct the rail track to the standard according to base point. Railway sleepers are buried in the subgrade. To fix them, first using railway sleepers’ fixings to harden up the ballast on the two sides, then evenly tamp the ballast under the sleepers and cover ...

  • Heavy Equipment Large Custom Hydraulic Cylinder

    Iron Horse Engineering Co. | Embedded Track Material

    Poured-in-place plates are used to secure rail into embedded concrete in lieu of full steel ties, or as a replacement for DF Plates when the rubber resilience is not needed. Iron Horse Engineering PIP-Fast system’s top-down construction method is adaptable to a variety of slab track forms.

  • air actuator CHKDB25R-25 smc pneumatics

    Railway Structures - Southern Email Group

    Jan 03, 2010· Jack arches are usually brick off wrought iron or steel beams, but Southover Road bridge at Lewes has concrete jack arches. There are also concrete jack arches in the bridge supporting Sutton station building. Relieving Arch: A relieving arch serves the same purpose as a blind arch, but it is open.

  • hydraulic manufacturer

    LBFoster US | Rail Business

    BCR2A’09 Railroad Track Design Including Asphalt Trackbeds Pre-Conference Workshop Introduction to Railroad Track Structural Design Don Uzarski, Ph.D., P.E.

  • Factory Garbage Compactor Hydraulic Cylinder price

    Stanley Infrastructure - World’s Largest Handheld

    Our European Rail Technologies Group is a world class engineering solutions business providing safety, reliability and performance of critical infrastructures Advanced Rail Monitoring Systems Our Wheel Impact Load Detector (WILD) systems evaluate millions of wheels per day throughout the international rail industry with proven accuracy and ...

  • hydraulic cylinder 2tons

    Stanley's Handheld Rail Grinder offers the highest power-to-weight ratio in the industry to deliver maximum job-site productivity. More » The LaBounty Mobile Demolition Processors exemplify the benchmark quality and performance in concrete demolition applications you would expect from the world-renowned attachment manufacturer More ...

  • air hydraulic jacks

    Time and expense to pour a concrete pad prior to installation and then to remove it at the end of the project can generally be avoided with pipe ramming technique. In fact, a pipe ramming project designed to start in the side of an unobstructed slope, as is the case for many rail bed culverts, does not require an insertion pit at all.

  • DC24V Mini Power Unit

    a. Casing pipes shall be not less than 5.5 feet below the base of rail at the closest point. Deeper installations may be required to avoid conflicts with buried railroad facilities. Where the pipe is not directly beneath the track, the depth of ground cover shall be not less than 4 feet. A 6 inch thick reinforced concrete shall be placed over the

Our Factory

Founded in 2012, Gaode Equipment Co., Ltd. (short:“Gaodetec”) owns the most advanced imported production equipment and complete production technology...

Read More

Factory Gallery

Contact Us